Laserfiche WebLink
Page 2 <br />N) No commodities to be removed from site. <br />0) No commodities to be removed from site. <br />P) No explosives to be used on site. <br />Raftopoulos - BLM permit <br />Exhibit "D" <br />Reclamation Plan <br />A) Reclamation will begin on approval of permits. <br />B) Grading of final topography shall be done with slopes of no steeper than 3:1. <br />C) <br />1) Very little topsoil on site (what is there will be saved and <br />replaced), mostly alkali bottom material persists in the area. <br />2) Site will be seeded immediately grading has been done. <br />3) Reseeding of reclaimed areas shall be done in accordance with <br />BLM recommendations. <br />4) Seed will be drilled. <br />5) N/A <br />6) No shrubs or trees to be planted. <br />D) Access road depicted on maps will remain after reclamation. <br />E) N/A <br />F) Reclamation cost - Phase 1 <br />1) overburden placement and slope rebuilding = 3000 cu.yds. x $0.50/ cu.yd. = <br />$1500 <br />2) topsoil placement = 650 cu.yds x $0.50/ cu.yd. = $325 <br />3) reseeding = 1 Sainfoin — 2.5 lbs/acre <br />2 Bromine Smooth — 1.6 lbs/acre <br />3 Intermediate Wheatgrass — 2.5 lbs/acre <br />4 Pubescent Wheatgrass — 2.25 lbs/acre <br />5 Orchard — 0.3 lbs/acre <br />cost = $500/ acre <br />4) Mobe and de-mobe = $3000 <br />Total cost $5325 <br />