Laserfiche WebLink
Page 3 <br />F) Reclamation cost - Phase 2 <br />1) overburden placement and slope rebuilding = 500 cu.yds. x $2.00/ cu.yd. = <br />$2000 <br />2) topsoil placement = 650 cu.yds x $0.50/ cu.yd. _ $325 <br />3) reseeding = 1 Sainfoin — 2.5 lbs/acre <br />2 Bromine Smooth —1.6 lbs/acre <br />3 Intermediate Wheatgrass — 2.5 lbs/acre <br />4 Pubescent Wheatgrass — 2.25 lbs/acre <br />5 Orchard — 0.3 lbs/acre <br />cost = $500/ acre <br />4) Mobe and de-mobe = $0 <br />Total cost $4825 <br />Exhibit "F" <br />Other permits and licenses needed <br />1) 404 permit is in the process with Corps of engineers. <br />2) BLM mining permit is in the process. <br />Exhibit "G" <br />Source of legal right to enter land: <br />1) Browns Park Allotment #04320. <br />Exhibit "H" <br />No municipalities within 2 miles. <br />Exhibit "L" <br />Permanent manmade structures <br />1) Stack yard depicted on the exhibit "E" maps are owned by the permit applicant. <br />