My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-27_REPORT - M2008022
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2008022
>
2015-10-27_REPORT - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:58 PM
Creation date
10/28/2015 9:03:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
REPORT
Doc Date
10/27/2015
Doc Name
Proposed Mitigation Plan
From
WestWater Engineering for Elam Construction, Inc.
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 — Final Stabilization and Long -Tenn Stormwater Management <br />'Ellis section provides a description of the measures used to achieve final stabilization and <br />measures to control pollutants w stormwater discharges after mining operations have been completed, in <br />accordance with the guidance documentation (CDHPE, 1994)." final stabilization will be reached when all <br />soil disturbing activities at the site have been completed, and uniform vegetative cover has been established <br />with a density of at least 70 percent of pre -disturbance levels or equivalent permanent, physical erosion <br />reduction methods have been employed." <br />(here will be 2 ponds constructed as part of the reclamation activities at this mining site. There <br />are no planned outfalls or culverts. The ultimate reclamation oldie site is for ponds and pasture land <br />Reclaim topography will be flat --3% sloping to the north. DRM&(G and Soil Conservation Service <br />recommended seed mix and methods will he followed for concurrent reclamation along pond edges. Most <br />final grade activities will take place as mining activities proceed. Efforts will he made to achieve final <br />grade stabilization as soon as possible after excavation activities have been completed in any given area of <br />the site. <br />WestWater Engineering APPENDIX C - 29 July 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.