My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-19_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-10-19_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:47 PM
Creation date
10/22/2015 10:11:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
10/19/2015
Doc Name
3rd 2015 Quarter refuse pile inspection report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 3 <br />#01349-0001+ ) Huddleston -Berry <br />10/14/15 enrmnrmas t = mg, uc <br />Discussion of Vibrating Wire Piezometers <br />VWP-A Deep <br />VWP-A Deep was installed on October 6, 2014 near the northern edge of CWDA No. 3. VWP- <br />A Deep was installed in the foundation soil approximately eight feet below the bottom of the <br />gob. Since installation, the pore pressures recorded at VWP-A Deep have generally decreased. <br />In general, HBET does not believe that the pore pressure changes in VWP-A Deep are cause for <br />concern regarding stability of the gob pile. <br />VWP A Shallow <br />VWP-A Shallow was installed on October 6, 2014 near the northern edge of CWDA No. 3. <br />VWP-A Shallow was installed approximately ten feet above the base of the gob. After <br />installation, the pore pressures dropped until November 2014. However, since that time, slight <br />increases in the pore pressures have been recorded at VWP-A Shallow. In general, the increases <br />in pore pressures at VWP-A Shallow are likely due to gob placement at CWDA No. 3. <br />However, HBET does not believe that the pore pressure changes in VWP-A Shallow are an <br />indication of instability in CWDA No. 3. <br />VWP-B Deep <br />VWP-B Deep was installed on October 6, 2014 in the west -central portion of CWDA No. 3. <br />VWP-B Deep was installed in the foundation soil approximately ten feet below the bottom of the <br />gob. Since installation, the pore pressures recorded at VWP-B Deep have been fairly constant. <br />HBET does not believe that the pore pressure changes in VWP-B Deep are an indication of <br />instability in CWDA No. 3. <br />VWP-B Shallow <br />VWP-B Shallow was installed on October 6, 2014 in the west -central portion of CWDA No. 3. <br />VWP-B Shallow was installed approximately ten feet above the base of the gob. Since <br />installation, the pore pressures recorded at VWP-B Shallow have fluctuated with periods of <br />slight increase and slight decrease. Since March 2015 there has been an increase in the pore <br />pressures at VWP-B Shallow. However, this likely reflects active gob placement at CWDA No. <br />3. In general, HBET does not believe that the pore pressure changes in VWP-B Shallow are an <br />indication of instability in CWDA No. 3. <br />uâ–º,VMS] <br />VWP-D was installed on October 7, 2014 in the east -central portion of CWDA No. 3. VWP-D <br />was installed approximately ten feet above the base of the gob. Since installation, the pore <br />pressures recorded at VWP-D have fluctuated. However, there was a slight increase in pore <br />pressures since June 2015. However, this likely reflects active gob placement at CWDA No. 3. <br />In general, HBET does not believe that the pore pressure changes in VWP-D are an indication of <br />instability in CWDA No. 3. <br />Site Visit Observations <br />HBET visited the site on October 6, 2015. At the time of our visit, no mine waste was being <br />placed at CWDA No. 3. However, the contractor was moving rip -rap at the toe of the coverfill <br />stockpiles east of CWDA No. 3. <br />X:\2008 ALL PROJECTS\01349 -Bowie Resources, LLC\01349-0001 Bowie Mine\200 - Geo\Gob 3\Imtr ntation Monitoring\01349-0001 GP3 3rdQ 2015 LR101415.doe 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.