Laserfiche WebLink
II. Background and History of the Sunlight Mine <br />The Sunlight Coal Mine was developed prior to 1910 by Colorado Fuel & Iron (CF&I) in search of <br />metallurgical coal. CF&I abandoned the property when the coal was determined to be other than <br />metallurgical. There have been numerous owner -operators over the years, the last being the Garfield <br />Energy Corporation (GEC). All mining operations have been conducted from the same portal <br />location and have used an incline driven down the dip of the "D" seam of coal for access and <br />haulage. All mining operations have been room and pillar with haulage ways driven on strike, and <br />the coal seam mined up the dip of the coal seam (42 degrees). <br />GEC obtained a permit from the Mined Land Reclamation Board on October 23, 1982. The permit <br />area encompassed roughly 180 acres, where 5.24 acres of surface were disturbed and 7.31 acres were <br />affected (surface disturbance plus under -mined areas). Surface mining activities of the Sunlight <br />Mine disturbed two areas adjacent to, and located on the north and south sides of, Garfield County <br />Road 117 (GCR 117), and a small area of disturbance further to the north. Mining -related features <br />that were in use at the time the permit was issued, and were subsequently in use as approved by the <br />permit, included two portals (one below and one above GCR 117, both now sealed and reclaimed), <br />an air shaft (now closed) approximately 0.2 mile north of the road, two sediment ponds (one <br />reclaimed), an upland diversion ditch (above the road), an equipment disposal area (now reclaimed), <br />and a facilities area (now reclaimed). Pre -law disturbances that were not incorporated into permitted <br />operations include two small settlement features (0.05 mile north of the road), coal mine waste along <br />Fourmile Creek, and a coal mine waste pile above the road. Reclamation of these pre -law items was <br />accomplished under the Division's Inactive Mines Reclamation Program (IMRP). The closed <br />airshaft and the two settlement features have been noted by IMRP. <br />III. Reclamation Funding <br />The Division issued a show cause order to GEC on March 4, 1987. GEC was `ordered to show <br />cause' why the permit should not be suspended or revoked based on a pattern of violations. The <br />MLRB minutes of April 22, 1987 state that the operator was contacted on several occasions but no <br />response was received. The permit was revoked and the bond in the amount of $11,800.00 was <br />forfeited on April 22, 1987. <br />Additional reclamation performed at the mine site in 1994, 1999 and 2003 was funded by state <br />severance taxes paid in part by producing coal mines in Colorado and utilized by the Inactive Mine <br />Reclamation Program (IMRP). <br />The Sunlight Mine is a permit-revocation/bond forfeiture site. The entire amount of forfeited <br />reclamation bond has been used for reclamation of the site. No surplus money is available for return <br />F <br />