Laserfiche WebLink
RECLAMATION ESTIMATE <br />Task No.: 1 <br />Permit No.: C-1996-038 <br />Date: 10-09-15 <br />Permitting Action: Technical Revision Application No. 105 <br />....................................................................................................... <br />Task Description: Replace topsoil at final reclamation <br />....................................................................................................... <br />Prepared by: TKB <br />Filename: <br />Operation: Bowie No. 2 Mine <br />STRUCTURE/FACILITY/EQUIPMENT DESCRIPTION DIMENSIONS COMPOSITION QUANT. UNIT UNIT COST TOTAL COST <br />Use Bowie No. 2 Mine reclamation estimate unit <br />costs to estimate Bowie No. 2 Mine bond amount <br />Reference Bowie No. 2 Mine - Task No. 46 from MT -04 <br />Replace topsoil from stockpile F/F1 to Disturbed area around Pile #3 (1.4') 2.3 Acres 5150 CY $ 1.010 $ 5,201.50 <br />Place coverfill on gob pile #3 (2 6') I I I 2.3 Acres 9564 $ 1.73 <br />Subtotal I I I I I I 1 1$ 5,201.50 1 <br />IBurden I I I I I 1 1 15%1$ 78023 <br />TASK TOTAL $ 5,981.73 <br />.............................. <br />.............................. <br />