Loveland Ready Mix Concrete, Inc. <br />October 13, 2014 <br />All Seasons Concrete was asked to organize their storage site, specifically to place <br />their drums of form oil on pallets and to place their trash in an enclosed trash <br />receptacle in lieu of empty drums. They will be relocating their storage site within <br />the next 2 years to make room for the mining of Cell 20. <br />Scrap steel that has been stockpiled on site was inventoried for removal or for reuse. <br />Any item marked for reuse will be relocated within the industrial plant area. The <br />remaining scrap steel will be removed as the mining of Cell 20 moves west. <br />See the attached Service agreement from Gallegos Sanitation and photos. <br />Problem/Possible Violation: State -listed noxious weeds (knapweed, cheat grass, <br />bindweed, tamarisk, Russian olives) on site. <br />Corrective Action: Attached invoices from McCrary and Sons show that weed <br />mowing had been occurring throughout the summer, and that fall mowing had <br />started on 9/10/2015. Attached estimate from Aggie Environmental shows pricing <br />for fall seeding at newly repaired Cell 18. Attached estimate for mowing from Aggie <br />Environmental was requested when it was discovered McCrary and Sons would not <br />be able to complete the fall mowing. Attached invoice from Aggie Environmental <br />dated 9/25/2015 is for mowing problem areas identified during inspection. <br />Attached invoices from Aggie Environmental, and Blue Mountain Seeding show <br />seeding that has occurred after 2010 inspection as part of the ongoing reclamation <br />process. Attached Loveland Ready Mix Profit and Loss Statement shows that LRM <br />has spent over $580,000 on flood repairs and reclamation after the 2013 flood. <br />The attached weed control plan from August Services, along with invoices, <br />documents the weed control management and specific control measures that have <br />been applied since the 2010 inspection. This weed control plan also provides a <br />schedule for future control measures and monitoring, and is specific for each noxious <br />plant. <br />Problem/Possible Violation: Missing boundary markers <br />Corrective Action: Landmark Engineering placed stakes at the southern boundary of <br />the permit area along with stakes locating the area included in AM03. T posts were <br />placed at corners and strategic areas with no trespassing signs. Photos are attached. <br />If you have any questions or require additional information, please advise. <br />Sincerely, <br />c�c_` <br />Stephanie Fancher <br />Loveland Ready Mix Concrete, Inc. <br />Attachments <br />cc: file <br />