Laserfiche WebLink
3.3 SITE RECLAMATION <br />The three drill pads and the temmporary road to GWMS-02 will <br />have the topsoil stripped prior to drilling. After completion <br />of drilling, the pads and temporary road will be reclaimed <br />using native species and straw mulch. <br />4.0 DATA COLLECTION AND REPORTING <br />Data will be collected weekly and reports will be filed with the <br />CMLRD on a quarterly basis. <br />M11 <br />