My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-13_REVISION - C1981014 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-10-13_REVISION - C1981014 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:31 PM
Creation date
10/15/2015 7:41:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
10/13/2015
Doc Name
Appendix F Reclamation Cost Estimate (RN06)
From
Energy Fuels Coal, Inc
To
DRMS
Type & Sequence
SL3
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction: <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: 1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: 0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Hail Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />600.00 <br />-6.00 <br />3.00 <br />-3.00 <br />2938 <br />0.27 <br />Haul Time: 0.27 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />600.00 <br />6.00 <br />3.00 <br />9.00 <br />1930 <br />0.39 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 1,047.22 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.814 /LCY <br />0.39 <br />minutes <br />2.16 <br />minutes <br />869.19 <br />LCY/Hour <br />2 <br />Scraper(s) <br />869.19 <br />LCY/Hour <br />869.19 <br />LCY/Hour <br />Total job time: 7.77 Hours <br />Total job cost: $5,494 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.