Laserfiche WebLink
Task description: <br />Site: Southfield Mine <br />SCRAPER TEAM WORK <br />Replace Topsoil from Stockpile Ll to East Loadout <br />Permit Action: RN6 Permit/Job#: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 041 <br />Date: 8/1/2014 <br />User: JHB <br />State: Colorado <br />County: Fremont <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />icraper: I Cat 627G <br />-Dozer: NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />C'net Rrpnkrinwn- Scrnner Work Team <br />Abbreviation: None <br />Filename: C014-041 <br />COSTShift basis: 1 ver day <br />NA <br />NA <br />CAT 14M <br />Water Tanker, 2,500 Gal. <br />Snnnort Fnninment <br />Maintenance Eouinment <br />Total work team cost/hour: $707.46 <br />MATERIAL OUANTITIES <br />Initial volume: 6,000 CCY Swell factor: 1.125 <br />Loose volume: 6,750 LCY <br />Source of estimated volume: Map 15 and Page 2.05.3-60 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs/LCY <br />Material description: Earth - Dry packed <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 20.71 LCY <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$72.62 <br />NA <br />NA <br />NA <br />$42.03 <br />$7.43 <br />Operating cost/hour: <br />$187.56 <br />NA <br />NA <br />NA <br />$34.94 <br />$11.12 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$293.74 <br />NA <br />NA <br />NA <br />$101.43 <br />$18.55 <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$587.48 <br />Support: <br />$0.00 <br />Maint: <br />$119.98 <br />Total work team cost/hour: $707.46 <br />MATERIAL OUANTITIES <br />Initial volume: 6,000 CCY Swell factor: 1.125 <br />Loose volume: 6,750 LCY <br />Source of estimated volume: Map 15 and Page 2.05.3-60 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs/LCY <br />Material description: Earth - Dry packed <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 20.71 LCY <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />0.90 Minutes <br />0.60 Minutes <br />CIRCES Cost Estimating Software <br />