Laserfiche WebLink
EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable <br />Roadable <br />Equipment <br />Equipment <br />0.67 <br />0.67 <br />0.67 <br />0.67 <br />0.50 <br />NA <br />0.50 1 NA <br />2.33 1 1.33 <br />PUEBLO WEST <br />30.00 miles <br />45.00 mph <br />$6,970.45 <br />$113.59 <br />Total job time: 4.67 Hours <br />Total job cost: $7,084 <br />CIRCES Cost Estimating Software <br />