Laserfiche WebLink
Task description: <br />Site: Southfield Mine <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Mobilize/Demobilize Equipment for Remaining Reclamation <br />Permit Action: RN6 Permit/Job#: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 073 State: Colorado <br />Date: 8/1/2014 County: Fremont <br />User: JHB <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: C014-073 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />66.13 <br />$78.33 <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat D9T - 9SU <br />66.13 <br />$78.33 <br />$125.45 <br />1 <br />$203.78 <br />$125.45 <br />$250.00 <br />Cat 627G w/push- <br />43.48 <br />$65.78 <br />$117.55 <br />2 <br />$366.66 <br />$235.10 <br />$500.00 <br />pull <br />Drill/Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Seeder with Tractor <br />Power Mulcher <br />6.00 <br />$7.03 <br />$88.67 <br />1 <br />$95.70 <br />$88.67 <br />$250.00 <br />Reinco M90 <br />SCHRAMM <br />0.00 <br />$57.44 <br />$88.67 <br />1 <br />$146.11 <br />$88.67 <br />$250.00 <br />T450BH <br />Subtotals: 1 $940.51 1 $626.56 1 $1500.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip Return Trip <br />Cost/hr/ fleet Cost/hr/ fleet <br />Water Tanker, 2,500 Gal. $29.58 1 $29.58 $29.58 <br />Flatbed Truck, 6x4, 45K GVW $55.61 1 $55.61 $55.61 <br />Subtotals: $85.19 $85.19 <br />CIRCES Cost Estimating Software <br />