CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />A Cat smooth drum roller, a Cat excavator and a water truck conditioned and compacted SLF <br />prior to geomembrane deployment. <br />Cat dozers placed SLF below stations 30+00 to 44+00 of the ADR haul road. <br />Cat 740 haul trucks transported SLF from the Phase 1 stockpile to station J2+00. A Cat dozer <br />placed SLF in the vicinity of stations H23+00 to H26+00 and below stations J2+00 to J6+00. <br />Cat dozers placed SLF between stations F4+00 to F7+00 and H0+00. A Cat smooth drum roller <br />and a Cat excavator with a smooth drum roller attachment compacted the SLF between stations <br />F2+00 to F7+00 and the ADR haul road. <br />Cat 740 haul trucks transported SLF from the Phase 1 stockpile to the HM Bench. Cat dozers <br />placed SLF between stations F28+00 and HM2+00 to HM8+00. <br />Cameron SLF processing continued. <br />All of the above Soil Liner Fill material was placed, graded, and compacted per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />None. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />