My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-08_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-10-08_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:25 PM
Creation date
10/13/2015 5:08:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/8/2015
Doc Name
Weekly QA Report
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />A Cat smooth drum roller, a Cat excavator and a water truck conditioned and compacted SLF <br />prior to geomembrane deployment. <br />Cat dozers placed SLF below stations 30+00 to 44+00 of the ADR haul road. <br />Cat 740 haul trucks transported SLF from the Phase 1 stockpile to station J2+00. A Cat dozer <br />placed SLF in the vicinity of stations H23+00 to H26+00 and below stations J2+00 to J6+00. <br />Cat dozers placed SLF between stations F4+00 to F7+00 and H0+00. A Cat smooth drum roller <br />and a Cat excavator with a smooth drum roller attachment compacted the SLF between stations <br />F2+00 to F7+00 and the ADR haul road. <br />Cat 740 haul trucks transported SLF from the Phase 1 stockpile to the HM Bench. Cat dozers <br />placed SLF between stations F28+00 and HM2+00 to HM8+00. <br />Cameron SLF processing continued. <br />All of the above Soil Liner Fill material was placed, graded, and compacted per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />None. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.