Laserfiche WebLink
Table A-2.4 Impoundment Regrade Equipment Costs <br />Fleet Cost <br />Operation & <br />Equip Ownership Overhaul Attachments Operator Total <br />Cat D10R (single shift) 102.22 181.78 0 $ 38.49 $ 322.49 <br />(semi -U blade) <br />Light Plant 0 0 0 $ - $ - <br />Total 102.22 181.78 0 $---3-8.-49j $ 322.49 <br />w 0 a <br />Page No. 5 <br />