Laserfiche WebLink
Table A-2.3. Equipment costs for Regrading Roads <br />Fleet Cost <br />Operation & <br />Equipment Ownership Overhaul Attachments* Operator Total <br />single shift <br />Cat D10R w/ripper 102.22 181.78 0 $ 38.49 $ 322.49 <br />Light Plant 0 0 0 $ - $ - <br />Total 102.22 181.78 0 $ 38.491$ 322.49 <br />* Ripper costs included for ripping, omitted for grading <br />Page No. 4 <br />