My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-31_PERMIT FILE - C1981010A (18)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2015-08-31_PERMIT FILE - C1981010A (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 10:12:03 AM
Creation date
10/9/2015 12:42:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
8/31/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix A Reclamation Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table A-11.1 Summary of estimated revegetation quantities and costs. Page No. 32 <br />Postminina <br />Unit Cost <br />Total Cost <br />Land Use <br />Location <br />Acres <br />/acre 1 <br />Cropland <br />0 <br />$ <br />223.64 <br />$ <br />Rangeland <br />Facilities <br />74.0 <br />$ <br />193.67 <br />$ <br />14,331.58 <br />w/o shrubs <br />Roads etc. <br />132.3 <br />$ <br />193.67 <br />$ <br />25,628.35 <br />AE Pd <br />$ <br />193.67 <br />$ <br />- <br />D/E Pit <br />32.2 <br />$ <br />193.67 <br />$ <br />6,240.05 <br />BC Road <br />58.2 <br />$ <br />193.67 <br />$ <br />11,273.53 <br />Ash Pit <br />45.0 <br />$ <br />193.67 <br />$ <br />8,705.47 <br />KLM Pits <br />$ <br />193.67 <br />$ <br />- <br />ZS Pit <br />$ <br />193.67 <br />$ <br />- <br />F Pit <br />$ <br />193.67 <br />$ <br />- <br />Coyote Pond <br />$ <br />193.67 <br />$ <br />- <br />Sage Pond <br />$ <br />193.67 <br />$ <br />- <br />Deal Pond <br />$ <br />193.67 <br />$ <br />- <br />West Horse Pond <br />$ <br />193.67 <br />$ <br />- <br />Far East Buzzard Pond <br />$ <br />193.67 <br />$ <br />- <br />Middle Pyeatt Ponds (acres are in Roads etc.) <br />5.7 <br />$ <br />193.67 <br />$ <br />1,105.86 <br />topsoil Piles <br />9.0 <br />$ <br />193.67 <br />$ <br />1,743.03 <br />Sub -Total <br />350.7 <br />$ <br />69,027.86 <br />Rangeland <br />w/shrubs <br />Facilities <br />0.0 <br />$ <br />508.93 <br />$ <br />- <br />Roads etc. <br />60.6 <br />$ <br />508.93 <br />$ <br />30,846.25 <br />AE Pit <br />327.0 <br />$ <br />508.93 <br />$ <br />166,415.02 <br />D/E Pit <br />268.5 <br />$ <br />508.93 <br />$ <br />136,637.53 <br />BC Road <br />0.0 <br />$ <br />508.93 <br />$ <br />- <br />Ash Pit <br />123.7 <br />$ <br />508.93 <br />$ <br />62,929.19 <br />KLM Pits <br />490.3 <br />$ <br />508.93 <br />$ <br />249,528.38 <br />ZS Pit <br />"i6 0 <br />$ <br />508.93 <br />$ <br />84,940.42 <br />F Pit <br />120.1 <br />$ <br />508.93 <br />$ <br />61,112.31 <br />Coyote Pond <br />14.0 <br />$ <br />508.93 <br />$ <br />7,125.02 <br />Sage Pond <br />11.5 <br />$ <br />508.93 <br />$ <br />5,852.70 <br />Deal Pond <br />3.0 <br />$ <br />508.93 <br />$ <br />1,526.79 <br />West Horse Pond <br />3.9 <br />$ <br />508.93 <br />$ <br />1,984.83 <br />Far East Buzzard Pond <br />0.5 <br />$ <br />508.93 <br />$ <br />254.47 <br />Middle Pyeatt Ponds <br />$ <br />508.93 <br />$ <br />- <br />to sod Piles' <br />27.7 <br />$ <br />508.93 <br />$ <br />14,097.36 <br />Sub -Total <br />1617.6 <br />$ <br />823,250.26 <br />Total Remaining Regrade <br />1968.3 <br />Acres <br />Re -seed For Failure (2) <br />Cropland re -seed <br />0 <br />$ <br />137.20 <br />$ <br />- <br />Rangeland w/o shrubs re -seed <br />75.1 <br />$ <br />193.67 <br />$ <br />14,544.62 <br />Rangeland w/shrubs re -seed <br />371.2 <br />$ <br />508.93 <br />$ <br />188,914.82 <br />Sub -Total <br />446.3 <br />$ <br />203,459.43 <br />Other Costs <br />Shrub Transplant 14 <br />clumps <br />11086 <br />per clump <br />$ <br />155,204.00 <br />Erosion Control Ditches 50000 <br />feet <br />52.39 <br />per 100 Feet <br />$ <br />26,195.00 <br />Drainage Stabilization 25.7 <br />acres (3) <br />17393 <br />per acre (4) <br />$ <br />447,000.10 <br />$ 1,724,136.65 <br />TOTAL <br />(1) Unit Cost from Table 1.4-11 <br />(2) Based on 17.5% failure rate of cropland (0.0 ac), rangeland w/o shrubs (429 ac) and rangeland w/shrubs (2,121 ac). <br />(3) 37,300 feet of re-established drainage, <br />30 feet wide. <br />(4) Trapper's actual cost for the year 2006. <br />
The URL can be used to link to this page
Your browser does not support the video tag.