Table A-10.8
<br />Calculations for time required for topsoiling - East Panel Ponds & A Road
<br />Nage No.
<br />31
<br />East Panel Ponds & A Road
<br />Tn4ck Hauls
<br />Production
<br />Adjusted*
<br />Fleet
<br />Route
<br />Cubic
<br />Rate
<br />Production
<br />Scraper/Truck
<br />Fleet
<br />Cost
<br />Total
<br />From
<br />Yards
<br />(cyds/hr)
<br />(cyds/hr)
<br />Hours
<br />Hours
<br />($/hr)
<br />($}
<br />($/cy)
<br />* ► �'
<br />a. ,4§1
<br />?, .4
<br />'0014403
<br />5.6$
<br />A92-3
<br />7,632
<br />240
<br />240
<br />32
<br />3.98
<br />$ 3,452.17
<br />$
<br />13,744.71
<br />$
<br />1.80
<br />A94-2
<br />105,122
<br />148
<br />148
<br />710
<br />88.74
<br />$ 3,452.17
<br />$
<br />306,336.96
<br />$
<br />2.91
<br />A96 -1A
<br />2,115
<br />236
<br />236
<br />9
<br />1.12
<br />$ 3,452.17
<br />$
<br />3,871.83
<br />$
<br />1.83
<br />A96-2
<br />26,216
<br />234
<br />234
<br />112
<br />13.99
<br />$ 3,452.17
<br />$
<br />48,297.66
<br />$
<br />1.84
<br />A97-3
<br />15,484
<br />234
<br />234
<br />66
<br />8.26
<br />$ 3,452.17
<br />$
<br />28,526.13
<br />$
<br />1.84
<br />JG6
<br />13,212
<br />205
<br />205
<br />65
<br />8.07
<br />$ 3,452.17
<br />$
<br />27,864.03
<br />$
<br />2.11
<br />JG7
<br />16,850
<br />202
<br />202
<br />83
<br />10.43
<br />$ 3,452.17
<br />$
<br />36,009.97
<br />$
<br />2.14
<br />JG8
<br />12,840
<br />213
<br />213
<br />60
<br />7.55
<br />$ 3,452.17
<br />$
<br />26,050.74
<br />$
<br />2.03
<br />MP1
<br />4,200
<br />240
<br />240
<br />18
<br />2.19
<br />$ 3,452.17
<br />$
<br />7,563.91
<br />$
<br />1.80
<br />MP2
<br />12,500
<br />253
<br />253
<br />49
<br />6.17
<br />$ 3,452.17
<br />$
<br />21,313.48
<br />$
<br />1.71
<br />MP7
<br />645
<br />242
<br />242
<br />3
<br />0.33
<br />$ 3,452.17
<br />$
<br />1,148.66
<br />$
<br />1.78
<br />G06 -DG
<br />4,844
<br />253
<br />253
<br />19
<br />2.39
<br />$ 3,452.17
<br />$
<br />8,259.40
<br />$
<br />1.71
<br />H04
<br />6,244
<br />261
<br />261
<br />24
<br />2.99
<br />$ 3,452.17
<br />$
<br />10,317.51
<br />$
<br />1.65
<br />SP5-94
<br />6,318
<br />234
<br />234
<br />27
<br />3.37
<br />$ 3,452.17
<br />$
<br />11,639.63
<br />$
<br />1.84
<br />SP6-94
<br />12,204
<br />250
<br />250
<br />49
<br />6.09
<br />$ 3,452.17
<br />$
<br />21,033.17
<br />$
<br />1.72
<br />Notal 340,887 192 192 1777 375.01 $ 2,956.10 1 $ 1,108,575.82 1 $ 3.25
<br />
|