My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-09_REPORT - C1981022
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981022
>
2015-10-09_REPORT - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:27 PM
Creation date
10/9/2015 10:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
10/9/2015
Doc Name
3rd Quarter 2015 Refuse Pile Report
From
Oxbow Mining, LLC
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Excavation will be done in stages to limit the amount of gob exposed to the air. The first area to <br />be excavated will be the rip rap channel on the west side of the pile. Rock will be removed <br />before removing and cooling hot materials. Hot materials will be spread either on the adjacent <br />road, or on the open gob pile above and will be cooled by quenching, compaction, or suffocation, <br />or by other means. <br />After the rip rap channel has been addressed, operations will move east to the embankment. Top <br />soil will be removed before removing hot material. <br />Water drainage will report to existing Pond C. <br />Only those persons authorized by the operator, and who have an understanding of the procedure <br />to be used, shall be involved in the extinguishing operation. Requirements of CFR 77.1713 will <br />be followed. <br />After all hot material has been removed and cooled, the material will be returned and will be <br />compacted. After compaction is complete and tested, the area will be covered with top soil and <br />will be reseeded in accordance with the refuse pile plan. <br />The project is anticipated to take roughly two weeks to complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.