Laserfiche WebLink
September 29, 2015 <br />2.2 Placement of Underdrainage Systems <br />The underdrainage system was completed in the first quarter of 2010; additional work on this <br />system is not anticipated. During the time of the inspection, there was less than a tenth of a <br />gallon per minute of water flow. <br />2.3 Installation of Surface Drainage Systems <br />Both the north and south surface drains were inspected (Photographs 4 and 5). At the time of <br />the inspection there was no water flow in either drainage. The upper drain was inspected and <br />was in excellent condition. <br />R�• e <br />Photograph 4: North Surface Drain Looking East (9/29/2015) <br />In <br />