Laserfiche WebLink
September 29, 2015 <br />Photograph 2: North Site above the 7350 Bench Elevation (9/29/2015) <br />.7 , <br />Photograph 3: Spring above the 7470 Bench Elevation (9/29/2015) <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />Topsoil and organic material removal activities were not conducted during the quarter. <br />3 <br />