My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-01_GENERAL DOCUMENTS - M1979034
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1979034
>
2015-10-01_GENERAL DOCUMENTS - M1979034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:07 PM
Creation date
10/5/2015 4:30:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979034
IBM Index Class Name
General Documents
Doc Date
10/1/2015
Doc Name
Technical Revision Guidance for Corrective Action
From
DRMS
To
Dan Redmond
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dan Redmond <br />October 1, 2015 <br />Page 2 <br />Attach a revised mining maps) depicting you, phases or mining and proposed direction. <br />Include the current aisturbance as well as other key features such as buildings, roads and <br />topsoil piles. See Rule 6.3.5 for map requirements. <br />4 It is recommended that the operator get the pit re -surveyed to ensure accuracy of <br />maps and reporting of affected ar, eage. <br />rp Attach a revised reclamation i„ap(s) and reclamation narrative it neces,'a, y <br />• Attach the fee of $216 <br />when the division receives the requested TR W nth the appropriate tee the TR is conside, ed 'filed'. <br />Once fled the Division has 3u days to determine if the ►equests is approvable. It more information <br />is required a letter will be sent identitying deficiencies that need tu be addressed. A decision will be <br />made at the end of that 30 day review perioa or sooner it possible. A letter will be sent to the <br />open ator of the Division decision regarding the TK. <br />As the esult of a TR staff will re -calculate the bond based on site conditions and to reflect the <br />changes addressed «, the TR request. A separate letter will be ae„t iotifying the operator it the <br />bona currently held by the D;viaim, is insurricient. <br />The Division acknowledges that the items mentioned above are in an effort to move towards the <br />requi, ed succession of operator. The Division is will►ig to extend the nate of compliance. October 6, <br />2015, for resold„g the Right of Entry issues as long as docume„tation demonstrating progress is <br />being made is sent to staff. <br />If you require additional informat;un, o, have questions or concerns, please feel h ee to contact me. <br />Amy Yeldell at the Division of Reclamation, Mini„g and Safety, 1313 Sherman St., Room 215, <br />Denver, CO 80203. u►rect contact can be made by phone at 970-254-8511 or via email at <br />amy.yelaellC) staue.co.us <br />XA MAY <br />Amy Yeldell <br />Environmental Pi otect;on Specialist <br />Department of Natural Resource <br />Division of Reclamation, Mining and Safety <br />Phone: (970) 254-8511 <br />Fax: (970) 241-1516 <br />Ec: <br />Russ Means, Senior EPS / Field Office Supervisor, Grand Junction DRMS <br />Mike uomez, General Operating Company <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.