My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-05_REVISION - M2008022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008022
>
2015-10-05_REVISION - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:32 AM
Creation date
10/5/2015 4:26:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
Revision
Doc Date
10/5/2015
Doc Name
Reclamation Cost Update & Notice of SI02
From
DRMS
To
Russell Larsen
Type & Sequence
SI2
Email Name
ACY
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UUSI JUMMAKY WUKK <br />1 ask aeba1 iptioii: Reclamation Cost Update <br />ls. eeLe lia3i11 Saud & G1 avel reluut AC11O11: <br />Situ: rit <br />ZO1D-09 1113p,ecti0u <br />M ult/JuDR: MZOOSUZZ <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Abbreviation: <br />None <br />Date: 9 21'2015 County: Moffat <br />Filename: <br />M022-001 <br />Usu.: ACY <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Form <br />Fleet <br />Task <br />M3c& IVtlell <br />Used <br />Size <br />Hours <br />Cost <br />O 1 a Decrease pit water level 15 feet <br />� <br />PUMPING 1 <br />� <br />292.27 <br />$17,083.00 <br />$834.00 <br />$2,285.00 <br />$2,526.00 <br />1 $3,703.00 <br />$13,386.00 <br />02a Highwall reduction DOZER 1 3.99 <br />03a <br />Rip stockpile area and temporary access RIPPER 1 10.25 <br />04a <br />Push topsoil over pit slopes and stockpile area DOZER <br />1 12.09 <br />05a <br />Revegetate pit slopes REVEGE <br />1 8.00 <br />05b <br />Revegetate stockpile area REVEGE <br />1 16.00 <br />Mobilize reclamation crew and equipment <br />MOBILIZE <br />06a <br />1 <br />2.57 <br />$2,518.00 <br />$828.00 <br />06b <br />Secondary mobilize reclamation crew MOBILIZE <br />1 j 2.57 <br />SU15101ALS: <br />347.74 $ $43;163 <br />INDIRECT COSTS <br />0Vr&hrAU A1NlJ rKOr11: <br />Liability 1113u1ai cc: Z.UZ <br />1 vial = <br />$8/1.99 <br />rert011uaiiCe U011a: I.OJ <br />1 Otal z <br />$4--)S.Z 1 <br />JOU but,emitcll3c11t: 40.00 <br />1 Otal = <br />$37005.40 <br />Profit: 10.00 <br />Total _ <br />$4,316.30 <br />TOTAL O & P <br />$8,647.80 <br />CONTRACT AMOUNT <br />(direct <br />+ O & P) _ <br />$51,810.80 <br />LtGAL - LNGINEERING - rKOJEC 1 1viANAGrlvirly i: <br />rulaueial wa.lauty PIUC'c33111g (legal: elated COSta): <br />DOO.00 <br />Imal = <br />J06.0 <br />r.ugiueMmg w01K autl/O1 COutiaCt/DiCl plupalati0u: <br />U.UU <br />1 Otat - <br />$0.00 <br />KCC14111U6011 ulauag'culeut MIZI/01 a9miuibtiativu: <br />J.00 <br />$2; -*)90..)4 <br />CON 1 INGENCY: <br />0.00 <br />Total - <br />$0.00 <br />TOTAL INDIRECT COST - $11,738.34 <br />TOTAL BOND AMOUNT (direct + indirect) $54,901.34 <br />�A55,OCO <br />
The URL can be used to link to this page
Your browser does not support the video tag.