Laserfiche WebLink
BULL1)OLtK KIFFINQ WUKK <br />Task dc3c. iptiu..: Ki <br />�p compacted areas <br />Site: Deakins Pit re,nut Action: 2015-09 Inspection remiit/intw: M2001060 <br />PROJECT IDENTIFICATION <br />1 asK #: 03A State: Colmado <br />Vate: 9 162015 County: Moffat <br />User: ACY <br />Agc„Cy Ch vigainiation name: DRMS <br />HOURET EQUIPMENI cosi <br />bawr MaCni„e: Cat D9T - 9SU <br />Kippe, Attaclllric„ t: 3 -Shank Ripper <br />Cott tf,eakdown: <br />Abbreviation: No..e <br />File..au.e: m050-u.ia <br />tial repo we, : 405 <br />Shirt tsasis: I er day <br />Vata Source: (CRG) <br />Utilization % <br />Ownership Cost/Hou,: <br />$81.1u <br />NA <br />Operating Co3tfflu.,: i <br />$14s.16 <br />100 <br />Ripper Opc.ati..g Cu5uHou,: <br />$8.91 <br />100 <br />Ope,aty, Lost/Hou,: <br />$38.01 <br />NA <br />Total Unit Cn3t/Hvu.: <br />$2 # 1.17 <br />Production pc, u..it a.'ca: <br />1 Wal t, loot Cost/HOU,: <br />$271.17 <br />Job Co.,ditim, Cc,lectio„ tactors <br />MATERIAL QUANTITIES <br />Selected e3ti..a rti„g 11,etnv8: Area <br />Alternate Method3: <br />0.811 <br />Ac.e3/hr <br />5651111C: NA Bank V vlu,ue: NA <br />BCY <br />Area: 14.00 acres Kip 1jeptn (11): 2.00 <br />Volume: 45,1 1.5 <br />Source of estimated quantity: <br />R�cla..,ativ„ fvia <br />JDo t:11,C,rncy: <br />HOURLY PRODUCTION <br />(1 3hift/day) <br />Net Correction: <br />Seismic: <br />,,,ultiplie, <br />Ad�u3ted riou,ly unit r,vauct, n <br />Seisunc velocity: <br />NA <br />tccet/buc 7„a <br />Area: <br />A�c,age K,pp,n% Veptn: <br />2.63 <br />mph <br />Avclag'c Kippu,g Wiatn: <br />7.67 <br />dog, eon <br />Avo.age Kippi„ g Length: <br />150.00 <br />feet <br />Ave,age Dozer Speed: <br />88.00 <br />trot <br />Average Maneuver Time: <br />0.2:) <br />teet <br />Production pc, u..it a.'ca: <br />0.811 <br />acres/hour <br />Job Co.,ditim, Cc,lectio„ tactors <br />Unadjusted Hou,ly u„it Y,Oauctithl: <br />0.811 <br />Ac.e3/hr <br />Sir Altitude: <br />67200 <br />feet <br />Altitu'nc ABS: <br />1.00 <br />(CAT HB) <br />JDo t:11,C,rncy: <br />0.83 <br />(1 3hift/day) <br />Net Correction: <br />0.83 <br />,,,ultiplie, <br />Ad�u3ted riou,ly unit r,vauct, n <br />0.67 <br />Ac.e3 hr <br />Adju3te3 tlau,ly deet Production <br />0.67 <br />Ac.c3/,ll <br />JOB TIME AND COS I <br />Fleet size: 1 GIaao,kb) <br />Total job time: <br />Lu.80 <br />Unit cost: reel arse <br />Total job cost: <br />$to,641 <br />INA <br />t1C Y or CCY <br />Hours <br />CIRLES Coat Estimating Software <br />