BULL1)OLtK KIFFINQ WUKK
<br />Task dc3c. iptiu..: Ki
<br />�p compacted areas
<br />Site: Deakins Pit re,nut Action: 2015-09 Inspection remiit/intw: M2001060
<br />PROJECT IDENTIFICATION
<br />1 asK #: 03A State: Colmado
<br />Vate: 9 162015 County: Moffat
<br />User: ACY
<br />Agc„Cy Ch vigainiation name: DRMS
<br />HOURET EQUIPMENI cosi
<br />bawr MaCni„e: Cat D9T - 9SU
<br />Kippe, Attaclllric„ t: 3 -Shank Ripper
<br />Cott tf,eakdown:
<br />Abbreviation: No..e
<br />File..au.e: m050-u.ia
<br />tial repo we, : 405
<br />Shirt tsasis: I er day
<br />Vata Source: (CRG)
<br />Utilization %
<br />Ownership Cost/Hou,:
<br />$81.1u
<br />NA
<br />Operating Co3tfflu.,: i
<br />$14s.16
<br />100
<br />Ripper Opc.ati..g Cu5uHou,:
<br />$8.91
<br />100
<br />Ope,aty, Lost/Hou,:
<br />$38.01
<br />NA
<br />Total Unit Cn3t/Hvu.:
<br />$2 # 1.17
<br />Production pc, u..it a.'ca:
<br />1 Wal t, loot Cost/HOU,:
<br />$271.17
<br />Job Co.,ditim, Cc,lectio„ tactors
<br />MATERIAL QUANTITIES
<br />Selected e3ti..a rti„g 11,etnv8: Area
<br />Alternate Method3:
<br />0.811
<br />Ac.e3/hr
<br />5651111C: NA Bank V vlu,ue: NA
<br />BCY
<br />Area: 14.00 acres Kip 1jeptn (11): 2.00
<br />Volume: 45,1 1.5
<br />Source of estimated quantity:
<br />R�cla..,ativ„ fvia
<br />JDo t:11,C,rncy:
<br />HOURLY PRODUCTION
<br />(1 3hift/day)
<br />Net Correction:
<br />Seismic:
<br />,,,ultiplie,
<br />Ad�u3ted riou,ly unit r,vauct, n
<br />Seisunc velocity:
<br />NA
<br />tccet/buc 7„a
<br />Area:
<br />A�c,age K,pp,n% Veptn:
<br />2.63
<br />mph
<br />Avclag'c Kippu,g Wiatn:
<br />7.67
<br />dog, eon
<br />Avo.age Kippi„ g Length:
<br />150.00
<br />feet
<br />Ave,age Dozer Speed:
<br />88.00
<br />trot
<br />Average Maneuver Time:
<br />0.2:)
<br />teet
<br />Production pc, u..it a.'ca:
<br />0.811
<br />acres/hour
<br />Job Co.,ditim, Cc,lectio„ tactors
<br />Unadjusted Hou,ly u„it Y,Oauctithl:
<br />0.811
<br />Ac.e3/hr
<br />Sir Altitude:
<br />67200
<br />feet
<br />Altitu'nc ABS:
<br />1.00
<br />(CAT HB)
<br />JDo t:11,C,rncy:
<br />0.83
<br />(1 3hift/day)
<br />Net Correction:
<br />0.83
<br />,,,ultiplie,
<br />Ad�u3ted riou,ly unit r,vauct, n
<br />0.67
<br />Ac.e3 hr
<br />Adju3te3 tlau,ly deet Production
<br />0.67
<br />Ac.c3/,ll
<br />JOB TIME AND COS I
<br />Fleet size: 1 GIaao,kb)
<br />Total job time:
<br />Lu.80
<br />Unit cost: reel arse
<br />Total job cost:
<br />$to,641
<br />INA
<br />t1C Y or CCY
<br />Hours
<br />CIRLES Coat Estimating Software
<br />
|