Laserfiche WebLink
Bulldozer Work.hcet CoLit'd Task # 02A <br />Spoil pile: 0.800 <br />rush g.adie..t: 1.000 <br />Altitude: 1.000 <br />Material Weight: U. /ys <br />mase type: 1.000 <br />Net correction: 0.3554 <br />Adjusted unit product.o.,: 790.u.Z LCYfnr <br />Adjusted fleet Y.oaumlon: 790.02 LCYIhr <br />JOB TIME AND COST <br />Flan 3i�z: 1 <br />U..it cost: $0,32I/LUY <br />1 metal Jul)time: 7.93 Hours <br />1 t7ta1 jvb cost: $1784 <br />(FND-RF) <br />(CAT HB) <br />(CA 1 HIS) <br />(CAT HB) <br />(PAI) <br />rage L of 2 <br />