ULMULl l lUN W UK& <br />1 dz& aesC1iptiou: Demo/removal of onsite structures and equipment <br />Site: lvlcCay Yit rciuiit ActiOii: LU0-US 1115pect.o.. rennit/JaM M1981088 <br />PROJECT IDENTIFICATION <br />Task #: 01A State: Colorado Abbreviation: None <br />Date: 8,20/2015 County: Roues Filc..a... c: M088 -Dia <br />User: ACY <br />Agency or organization name: DRMS <br />U1v11 cuSIS <br />Structure or Item Demolition Menu <br />Description Dimensions Selection Quantity <br />Office building and 30'x8'x8' Bldg. (SN) demo./off- 1,920.00 <br />shed site disposal in approved <br />I landfill - Max. 30 mile <br />haul <br />Removal of railroad 4,800' Railroad track - Ties and 4,800.00 <br />spur track 1 <br />Scale 20',.40' Loading and 5 mile haul, 11./0 <br />salvage allowed - Steel <br />frame structures <br />- Scale hn .mac 101 ,. 2u` . 10, Bldg. (SN) demo./on-site 2,000.00 <br />disposal in excavated pit <br />- Max. 200 ft. push <br />Scale and Scale house z DO& Demo. and on-site 150.00 <br />concrete disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. 200 <br />L ft. push <br />Subtotal <br />Job Hours: 48.00 (unadjusted): $49,240.28 <br />LUCatiUn aili uatmeut: 91.30 % <br />Unit Unit Total Cost <br />Cost <br />CF $1.15 $2,213.76 <br />LF $9.01 $43,248.00 <br />U Y $9.48 $110.92 <br />Cr $0.19 $3 /8.00 <br />i <br />Lk $20.56 $33289.60 <br />Total Cost <br />(adjusted for <br />location): $44,956.38 <br />