Laserfiche WebLink
COST SUMMARY WORK <br />1 a3K 3'c5e, i1,t,vu: rU3t iliapechull a MUM <br />Site: lvi:.CUy P:r Permit Action: 2015-08 Inspection <br />PROJECT IDENTIFIc:ATIuN <br />Task #: 001 state: Lolmil3o <br />Date: 8/20/2015 County: Routt <br />User: ACY <br />Agency or organization name: DRMS <br />Permit/Job#: M1981088 <br />Abb,eviatiuu: Nt1„e <br />Filename: M088-001 <br />Ta3k <br />Form <br />Descr. t.on Used <br />Fleet <br />Size <br />Task <br />Mu, 3 <br />coat <br />Ola <br />02a <br />Usa <br />04a <br />Ufa <br />06a <br />U /a <br />08a <br />Dc,110 of onsite struct,.res and eq,.il,ment DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />t <br />1 <br />48.00 <br />$44,956.38 <br />$11,1 / 1.0u <br />$8,956.00 <br />$11,175.00 <br />$12,462.00 <br />$108;088.00 <br />$5,973.00 <br />$17241.00 <br />Slope reduction to 3H:1 v 1jOZhK <br />x-1.05 <br />Rif, cn,,,Yactud a,ca3 RIPPER <br />39.68 <br />Placement of topsoil/overburden LOADEK <br />41.11 <br />Spead mp3ei1/uvc,b,.,dc„ DOZER <br />29.83 <br />Revegetate affected area REVEGE <br />60.00 <br />Mobili4c ,eclau,atiuL, e,cw and ccyuil,,,,-cut 1V10151L1L.t'. <br />6.00 <br />Secondary mobilize reclamation crew and MOBILIZE <br />equipment <br />6.00 <br />SUBTOTALS: <br />L2f4.bY <br />$ L16,0L.S <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Total o <br />$4,363.66 <br />rcrfelllla„cc b:,,,d: 1.05 <br />Total = <br />$2,268.24 <br />Jamb 3u1,e, u,tccudeut: 141..54 <br />1 vial = <br />$10.698.1 / <br />r,vt,t: lU.UO <br />Iatal <br />$L1.-0U2.SU <br />$U.UU <br />101AL U &r = <br />$S879SZA/ <br />10 1 AL 1N1JiKi--C i CON 1= <br />CONTRACT AMOUNT (direct + O & P) _ <br />$2543955.47 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />500.00 Total = <br />500.00 <br />t„gi„ee,i„g wv,k a„ d/m co,,t,act/bid y,cya,ativu: <br />0.00 Total = <br />$0.00 <br />Kerla,,,at,u„ ,,,a„arc,,,cut mud/m ad„1I„i3traLou: <br />:).UV <br />$12, /4 <br />CON 11NGtNC Y: <br />0.00 1 vial _ <br />$U.UU <br />10 1 AL 1N1JiKi--C i CON 1= <br />$�L_ 180.14 <br />TOTAL BOND AMOUNT (direct + indirect) _ <br />$2687203.24 <br />