Laserfiche WebLink
As new areas are mined, backfilling and topsoil replacement will occur on an ongoing basis. The total <br />mining pit area not reclaimed or disturbed at any one time is limited to 0.9 acres. <br />The breakdown of acreages is shown in the following Table D-1 for various stages of the operation: <br />Table D-1 — Disturbed Area Breakdown in Permit Area <br />Disturbed Areas <br />Maximum <br />All units in Acres <br />Disturbance Description <br />Mine Area 1- North <br />Side <br />Mine Areas 2,3,4 - <br />South Side <br />Process Area <br />0.38 <br />0.48 <br />Pit <br />0.9 <br />0.9 <br />Old Highwall and Setlling <br />Pond 3 <br />0 <br />0.18 <br />Water Holding Pond and <br />Surge Pond <br />0.3 <br />0.3 <br />Access Roads <br />1.9 <br />1.9 <br />Topsoil Stockpiles <br />0.14 <br />0.16 <br />Tree Removal <br />1.00 <br />1.00 <br />Total Max Disturbed Area <br />4.62 <br />4.92 <br />Max Area to Reclaim at one <br />time =Total - Roads - <br />Topsoil Stockpiles <br />2.58 <br />2.86 <br />The disturbed areas shown above include area of the old 110 permit disturbance. All existing roads will <br />be left in place at the end of mining. After Area 1 is mined, all mining on the north side of the River will <br />be completed and the crossing of the River will only be used for maintenance of the reclamation and <br />Sullivan Aggregate Pit March 2015 D-7 <br />