Laserfiche WebLink
Boulders may be individually excavated and sold directly. Some sand and gravel sales are possible but <br />this is not anticipated to be any significant quantity. Gold bearing gravel will initially be screened within <br />the pit and all material over 1/2" in size will remain in the pit and will be mixed with overburden in the <br />backfill. Gold bearing material less than 1/2" will be transported to the process plant. There is an existing <br />river crossing allowance from the US Army Corps of Engineers for the site but it will be moved to the <br />new location shown on Map C-2. No documentation has been formulated for this old crossing but <br />according to Todd Sullivan, (operator of JRS Mining LLC) the Corps inspected the crossing during the <br />past operation of the 110 permit and deemed it to be acceptable. This crossing will not be used during <br />the new operation, since the north side of the crossing is not within the permit area. The new crossing, as <br />shown on Map C-2, is located to the west of the old crossing and is within the permit area on both sides. <br />Details of the crossing are shown below: <br />C.ROS5 .SECT i0o <br />CYILTt 6 <br />k i vE,Q Ba1�12Z �6 <br />RcLK r Rau< <br />R lv&-R ROCA< t <br />f <br />I <br />u9cb� <br />Sullivan Aggregate Pit March 2015 D-3 <br />