Laserfiche WebLink
2015 Water Balance: Loloff Pit Substitute Water Supply Plan <br />Table 4 <br />Submitted by: <br />Paul Weiss, P.E. <br />5255 Ronald Reagan Boulevard, Suite 220 <br />Johnstown, CO 80534 <br />Depletions <br />Rfteplacemer� <br />Month <br />Monthly <br />Net <br />Evap <br />(ft) <br />ExposedWater <br />Water <br />Surface Area <br />(acres) <br />Evaporative <br />Losses <br />(ac -ft) <br />Mining <br />Production <br />(tons) <br />Water <br />Retained Used For <br />in Material Dust Control <br />(ac -ft) (ac -ft) <br />Total <br />CU <br />(ac -ft) <br />GIC ReturnGIC <br />tagged GIC Flow Net <br />Depletions Deliveries Obligation Credit <br />(ac -ft) (ac -ft) (ac -ft) (ac -ft) <br />Greeley <br />Leased <br />Effluent <br />(ac -ft) <br />Water <br />Balance <br />(ac -ft) <br />(A) <br />(8) <br />(C) <br />(D) <br />(E) <br />(F) <br />(G) <br />(H) <br />(I) <br />J) K) <br />M <br />(M) <br />Jan -15 <br />0.09 <br />1.52 <br />0.13 <br />24,000 <br />0.35 <br />0.20 <br />0.69 <br />L26 <br />0.00 <br />0.35 -0.35 <br />L75 <br />Q34 <br />Feb -15 <br />0.10 <br />L52 <br />0.16 <br />24,000 <br />0.35 <br />0.20 <br />0.71 <br />1.19 <br />000 <br />0.33 -0.33 <br />1.75 <br />0.23 <br />Mar -15 <br />0.16 <br />L52 <br />0.24 <br />24,000 <br />0.35 <br />0.40 <br />1.00 <br />1.19 <br />0.00 <br />0.31 -0.31 <br />L75 <br />0.25 <br />Apr -15 <br />0.26 <br />L52 <br />0.40 <br />36,000 <br />0.53 <br />0.40 <br />1.33 <br />1.28 <br />L18 <br />0.57 0.61 <br />1.50 <br />0.83 <br />Ma -15 <br />0.35 <br />1.52 <br />0.53 <br />1 60,000 <br />0.86 <br />0.40 1 <br />1.81 <br />1.44 <br />3.14 <br />1.09 2.05 <br />0.00 <br />0.61 <br />Jun -15 <br />0.42 <br />LS2 <br />0.64 <br />60,000 <br />0.88 <br />0.40 <br />L93 <br />1.61 <br />3.33 <br />1.19 2.15 <br />0.00 <br />0.54 <br />Jul -15 <br />0.44 <br />LS2 <br />0.67 <br />64,000 <br />094 <br />0.50 <br />2.11 <br />1.74 <br />4.31 <br />L46 2.86 <br />0.00 <br />L22 <br />Aug -15 <br />0:39 <br />L52 <br />0.60 <br />64,000 <br />094 <br />0.50 <br />2.04 <br />1.82 <br />3.72 <br />1.35 2.38 <br />0.00 <br />0.56 <br />Sep -15 <br />0.29 <br />LS2 <br />0.44 <br />60,000 <br />088 <br />0.40 <br />L73 <br />1.81 <br />2.35 <br />L02 1.33 <br />L00 <br />0.52 <br />Oct -15 <br />Q201.52 <br />0.31 <br />36,000 <br />Q53 <br />0.30 <br />L24 <br />1.66 <br />L57 <br />0.82 0.75 <br />1.00 <br />0.09 <br />Nov -15 <br />Q12 <br />1.52 <br />0.18 <br />24,000 <br />0.35 <br />0.20 <br />0.73 <br />143 <br />0.00 <br />0.41 -0.41 <br />2.00 <br />0.16 <br />Dec -15 <br />0.09 <br />L52 <br />0.13 <br />24,000 <br />035 <br />0.20 <br />0.69 <br />1.24 <br />0.00 <br />0.39 -0.39 <br />2.00 <br />0.37 <br />TOTAL <br />2.92 <br />4.43 <br />500,000 <br />7.36 <br />4.10 <br />15.89 <br />17.67 <br />19.6 <br />9.28 10.32 <br />12.75 <br />5.40 <br />Notes: <br />(A) Monthlyevaporation <br />(B) Exposed water surface <br />(C ) Monthly evaporation = (C) x (B) <br />(D) Estimated Production <br />(E) Water Retained in Material, assuming 2% Retention <br />(F) Estimated Water Use for Oust Control <br />(G) Total Consumptive Use = (C) + (E) + (F) <br />(H) tagged Depletions computed with AWAS <br />(1) Estimated GIC Deliveries per share <br />(J) Return Flow associated with one share of GIC <br />(K) Net River Credit for GIC share <br />(L) Effluent Credit from City of Greeley <br />(M) Net Impact toPoudre River =(K)+(U-(H) <br />WWC Water Resource Engineering <br />