My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-30_PERMIT FILE - M1985112
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1985112
>
2015-09-30_PERMIT FILE - M1985112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:17 PM
Creation date
10/1/2015 11:01:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
PERMIT FILE
Doc Date
9/30/2015
Doc Name
Application AM01
From
Loloff Construction
To
DRMS
Type & Sequence
AM1
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following recommendations for monitoring of slope stability should be followed: <br />A visual inspection of the excavated slopes should be done on a weekly basis for <br />the duration of mining. This inspection should consist of walking the existing <br />ground and looking for any signs of stress cracks or other potential signs of slope <br />failure. Some minor sloughing of slopes is expected on any mine site. The intent <br />of this inspection is to locate potential major slope failures that could potentially <br />extend back into a structure. <br />2. A visual inspection should be done after a major precipitation event that has <br />saturated the ground using the same procedures. A major precipitation event <br />would be defined as a storm that produces an intensity level reached once in 50 <br />years on the average. <br />3. If a visual inspection detects signs of a potential slope failure, qualified personnel <br />should be contacted to evaluate and recommend remediation work to stabilize <br />the area. <br />4. If no visible signs of slope failure are detected during mining, then the inspection <br />period could be reduced to once per 6 months after mining completion, or after <br />every major precipitation event. <br />Loloff Construction, Inc - Loloff Pit <br />J&T Consulting, Inc. Slope Stability Analysis <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.