My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-30_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2015-09-30_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:06 PM
Creation date
10/1/2015 8:45:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/30/2015
Doc Name
Adequacy Review
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
RN4
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MATERIAL OUANTITIES <br />Initial Volume: 130,200 <br />Swell factor: 1.000 <br />Loose volume: 130,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />2 Dozer(s) <br />Unit cost: <br />Unadjusted hourly 2,870.3 LCY/hr <br />Total job time: <br />production: <br />Total job cost: <br />$24,638 <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -25% <br />Average site altitude: 7,800 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.100 <br />(CAT HB) <br />Dozing method: <br />1.100 <br />(50% SL) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.516 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.9579 <br />Adjusted unit production: 2,749.46 LCY/hr <br />Adjusted fleet production: 5498.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />2 Dozer(s) <br />Unit cost: <br />$0.189/LCY <br />Total job time: <br />23.68 Hours <br />Total job cost: <br />$24,638 <br />
The URL can be used to link to this page
Your browser does not support the video tag.