My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-30_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2015-09-30_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:06 PM
Creation date
10/1/2015 8:45:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/30/2015
Doc Name
Adequacy Review
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
RN4
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.516 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.9579 <br />Shift Basis: 1 per day <br />Adjusted unit production: 2,749.46 LCY/hr <br />Data Source: (CRG) <br />Adjusted fleet production: 5498.92 LCY/hr <br />Cost Breakdown: <br />JOB TIME AND COST <br />Utilization % <br />Fleet size: 2 Dozer(s) <br />NA <br />Operating Cost/Hour: $308.78 <br />Unit cost: $0.189/LCY <br />Ripper op_ Cost/Hour: $0.00 <br />0 <br />Total job time: 0.91 Hours <br />NA <br />Total job cost: $946 <br />BULLDOZER WORK <br />Task description: Grade Remaining Valora Pit N/S Spoil Ridges <br />Site: Yoast Mine Permit Action: RN4 Permit/Job#: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 04A State: Colorado <br />Abbreviation: None <br />Date: 2/26/2014 County: Routt <br />Filename: C082 -04a <br />11:22:17 AM <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DI IR - I IU <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $173.50 <br />NA <br />Operating Cost/Hour: $308.78 <br />100 <br />Ripper op_ Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.01 <br />NA <br />Total unit Cost/Hour: $520.29 <br />Total Fleet Cost/Hour: $1,040.57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.