Laserfiche WebLink
Pury„t n <br />Table 3-3 Summary of Past Environmental Practices <br />3.5.1 Past Environmental Studies <br />Mr. Jeff Gaul, Cripple Creek & Victor (CC&V) Mining, indicated in his interview that some type of <br />rudimentary environmental report was completed for the entire mining permit, encompassing the Site and a <br />larger surrounding area. However, this report encompassed six volumes and was not easily accessible for <br />review and not reasonable to send for review. <br />3.6 Interviews <br />In completing this Phase I ESA, Pinyon contacted agencies and individuals who may have knowledge about the <br />Site (Table 1-1). Pertinent information regarding the interviews conducted can be found in sections 3.6.1, <br />3.6.2, 3.6.3, and 3.7. <br />3.6.1 Cripple Creek Fire Department <br />Mr. Baldwin, Cripple Creek Fire Department, stated that the Site is not within their response area; there is <br />no dedicated fire protection district for the Site. Additionally, he stated that he is not aware of any issues at <br />the Site. <br />Phase I Environmental Site Assessment Page 10 <br />Squaw Gulch <br />Teller County Road 88, Cripple Creek, Colorado <br />Identified (Yes <br />Section for <br />Environmental Practice <br />or No) <br />Additional <br />Information <br />Past Spills/Releases <br />Is the Site listed on an agency listing for a reported or suspected No <br />release or spill of petroleum products, hazardous wastes, or <br />hazardous substances? <br />Past Environmental Studies <br />Has an environmental assessment previously been conducted at Yes 3.5.1 <br />he Site? <br />Environmental Liens/Actions <br />Are there any pending, threatened or past litigation relevant to No <br />environmental issues at the Site? <br />Are there any pending, threatened or past administrative <br />No <br />proceedings relevant to environmental issues at the Site? <br />Are there any notices from any governmental entity regarding any No <br />possible violation of environmental laws at the Site? <br />3.5.1 Past Environmental Studies <br />Mr. Jeff Gaul, Cripple Creek & Victor (CC&V) Mining, indicated in his interview that some type of <br />rudimentary environmental report was completed for the entire mining permit, encompassing the Site and a <br />larger surrounding area. However, this report encompassed six volumes and was not easily accessible for <br />review and not reasonable to send for review. <br />3.6 Interviews <br />In completing this Phase I ESA, Pinyon contacted agencies and individuals who may have knowledge about the <br />Site (Table 1-1). Pertinent information regarding the interviews conducted can be found in sections 3.6.1, <br />3.6.2, 3.6.3, and 3.7. <br />3.6.1 Cripple Creek Fire Department <br />Mr. Baldwin, Cripple Creek Fire Department, stated that the Site is not within their response area; there is <br />no dedicated fire protection district for the Site. Additionally, he stated that he is not aware of any issues at <br />the Site. <br />Phase I Environmental Site Assessment Page 10 <br />Squaw Gulch <br />Teller County Road 88, Cripple Creek, Colorado