Laserfiche WebLink
Pinyon <br />2. Project and Site Information <br />2.1 Project Overview <br />Date of Task Order: July 13, 2015 <br />Work Authorized By: Michael Schad, Black Hills Corporation <br />Purpose of Phase I ESA: <br />The purpose of the Phase I ESA is to evaluate the potential for soil and/or groundwater contamination at the <br />Site, due to a release of hazardous substances or petroleum products. This Phase I is being completed for <br />due diligence prior to securing an easement for the Site. <br />Planned Transaction and Proposed Site Layout: <br />The report user, Black Hills Corporation, intends to secure an easement for construction of an electric utility <br />substation on the Site. <br />2.2 General Site Information and Current Conditions <br />Site Location (Figures I and 2): <br />Address: Teller County Road 88 <br />City, State: Cripple Creek, Colorado <br />County: Teller <br />Intersection: None <br />Other Roads: None <br />Site Information: <br />Assessor's Number: R0002238 <br />Current Site Owner: CC&V Gold Mining Company <br />Size of Site: Approximately 57,968 square feet (1.33 acres) <br />Status: Undeveloped <br />Current Zoning: CCMOD: Cripple Creek Mining Overlay District <br />Site Reconnaissance Information: <br />Date of Site Visit: July 18, 2015 <br />Personnel: Julie A. Linn, P.G.Error! Reference source not found., Pinyon <br />Phase I Environmental Site Assessment Page 5 <br />Squaw Gulch <br />Teller County Road 88, Cripple Creek, Colorado