My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-28_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2015-09-28_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:00 PM
Creation date
9/28/2015 1:12:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
9/28/2015
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
9/9/2015
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There are no major concerns regarding vegetation that were identified during this inspection. <br />However, possible reseeding may be necessary to ensure vegetation establishment is successful <br />along the reconstructed embankment of the Working Pond. <br />Signs and Markers (Rule 4.02) <br />The mine identification sign at the mine site entrance is intact and contained all necessary <br />information in accordance with 4.02.2. <br />Roads (Rule 4.03) <br />All roads traveled were in good shape and no signs of inadequate drainage were observed, with <br />the exception of minor erosion noted along the access road that leads to the West Taylor Pond. <br />There were several locations along this road that have eroded and will require maintenance. <br />Maintenance items identified during inspection: <br />• CCC will need to remove cleanout material that has been stockpiled on the embankment <br />of the West Taylor Pond; <br />• CCC will need to ensure erosional features that were identified along the access road to <br />the West Taylor Pond have been repaired; <br />• CCC will need to reinstall the hay wattles along the out slope of the embankment at the <br />Working Pond so as to ensure success of the intended functionality and design is <br />achieved. <br />General Compliance: <br />No disturbances to areas outside the permit area were noted. <br />No compliance issues were noted and no enforcement actions were taken as a result of this <br />inspection. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.