My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-09_REVISION - M1999120
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2015-09-09_REVISION - M1999120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:05 PM
Creation date
9/15/2015 11:06:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
REVISION
Doc Date
9/9/2015
Doc Name
Request TR07
From
LG Everist
To
DRMS
Type & Sequence
TR7
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: Technical Revision Request for Fort Lupton Sand & Gravel, M-1999-120 <br />Reclamation changes to Meadows North, Meadows South and Meadows West <br />Meadows West reclamation changes. <br />We are making minor changes to the reclamation configuration of the Meadows West reservoir. There <br />was an Anadarko well in the northern section of Meadows West called Anadarko Gas Well HG Mixon GU <br />#2, that stopped producing. Anadarko capped it and removed the well and corresponding pipelines, <br />which allowed L.G. Everist to mine through that area. There is another Anadarko well located in the <br />south-east section of this reservoir, called the Anadarko Gas Well Campbell 16-25. The pipelines <br />connected to this well have been straightened out, which gives a slightly different configuration around <br />the gas well and its corresponding pipelines and facilities. <br />With these minor oil and gas changes in mind, here are the updated acreages for Meadows West <br />We have enclosed a 24"x36" copy of the updated Exhibit F - Reclamation Plan Map (2015) which <br />shows the changes listed above to the three Meadows phases. <br />There is another change shown on the updated Exhibit F. The Division approved the release of two <br />reservoirs in 2013: Hill -Oakley reservoir and Fort Lupton East reservoir. This updated map shows these <br />two phases as released (grayed out), and the permit boundary line has been moved accordingly. <br />We have also enclosed letter -size copies of two maps for ease of reference: the updated Exhibit F - <br />Reclamation Plan Map (2015), and the previous Reclamation Plan Map (2012). <br />Updated Table E-1 - Reclamation Phases <br />We have enclosed an updated Table E-1 - Reclamation Phases (2015) which shows the changes listed <br />above to the three Meadows phases. We have removed the released phases (Hill -Oakley and Fort <br />Lupton East) from the property list on Table E-1. <br />We have also enclosed a copy of the previous Reclamation Phases Table (2012) for ease of reference <br />If you have any questions or need anything else to process this Technical Revision, please contact me at <br />303-286-2247 or Imshults@lgeverist.com. <br />Sincerely, <br />Lyn Mayer Shults <br />Regulatory Manager <br />cc: L.G. Everist (Dennis Fields, Richard Schneider, Jim Sittner, Matt Noteboom) <br />Environment, Inc. (Steve O'Brian) <br />attachments: <br />- TR FEE - Check #1846 for $216.00 <br />- TR FORM (1) - Request for Technical Revision (TR) Cover Sheet <br />- MAPS (3) - updated Exhibit F - Reclamation Plan Map (2015) (large & small), old Rec. Plan Map (2012) <br />- TABLES (2) - updated Table E-1 - Reclamation Phases (2015), old Rec. Phases Table (2012) <br />FL-DRMS-TR-ReclamationChanges-ML&MW-Sep20l 5.docx <br />O <br />Total <br />Area Name Lake Area <br />Reveg. <br />Setbacks / <br />Road <br />Acres <br />Area <br />Undisturbed <br />�Nmv <br />Meadows West (old) 73.57 52.50 <br />13.47 <br />3.11 4.49 <br />_ <br />a <br />o <br />co <br />Meadows West (new) 73.57 55.90 <br />12.17 <br />1.01 4.49 <br />o <br />(same total acres) <br />Updated Exhibit F - Reclamation Plan Map <br />We have enclosed a 24"x36" copy of the updated Exhibit F - Reclamation Plan Map (2015) which <br />shows the changes listed above to the three Meadows phases. <br />There is another change shown on the updated Exhibit F. The Division approved the release of two <br />reservoirs in 2013: Hill -Oakley reservoir and Fort Lupton East reservoir. This updated map shows these <br />two phases as released (grayed out), and the permit boundary line has been moved accordingly. <br />We have also enclosed letter -size copies of two maps for ease of reference: the updated Exhibit F - <br />Reclamation Plan Map (2015), and the previous Reclamation Plan Map (2012). <br />Updated Table E-1 - Reclamation Phases <br />We have enclosed an updated Table E-1 - Reclamation Phases (2015) which shows the changes listed <br />above to the three Meadows phases. We have removed the released phases (Hill -Oakley and Fort <br />Lupton East) from the property list on Table E-1. <br />We have also enclosed a copy of the previous Reclamation Phases Table (2012) for ease of reference <br />If you have any questions or need anything else to process this Technical Revision, please contact me at <br />303-286-2247 or Imshults@lgeverist.com. <br />Sincerely, <br />Lyn Mayer Shults <br />Regulatory Manager <br />cc: L.G. Everist (Dennis Fields, Richard Schneider, Jim Sittner, Matt Noteboom) <br />Environment, Inc. (Steve O'Brian) <br />attachments: <br />- TR FEE - Check #1846 for $216.00 <br />- TR FORM (1) - Request for Technical Revision (TR) Cover Sheet <br />- MAPS (3) - updated Exhibit F - Reclamation Plan Map (2015) (large & small), old Rec. Plan Map (2012) <br />- TABLES (2) - updated Table E-1 - Reclamation Phases (2015), old Rec. Phases Table (2012) <br />FL-DRMS-TR-ReclamationChanges-ML&MW-Sep20l 5.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.