Laserfiche WebLink
August 24, 2015 C-1983-059/Terror Creek Loadout JRS <br />- The only structures that remain at the office level are the office and two trailers <br />TOPSOIL — Rule 4.06: Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />- The topsoil stockpiles by the sediment pond and dugout pond were both well vegetated and stable. No erosional <br />problems were noted on either pile at the time of the inspection. <br />DOCUMENTS RECEIVED: None <br />This concludes the 24 August 2015 partial inspection report for the Terror Creek Loadout. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 6 <br />