Laserfiche WebLink
6) New wells drilled as a result of the facilities relocation <br /> technical revision should be included in the monitoring program desciKption in <br /> Section 3 of the,epermit. Revised pages should be submitted. <br /> 7) NCEC should note that the Division has not approved the wells <br /> drilled in the proposed loadout"area. The Division remains concerned about <br /> the completion of Wells OW-15 and OW-16 in particular. Monitoring of these <br /> wells may potentially be unacceptable as baseline data. <br /> 8) Baseline data indicates generally poor water quality in the area of <br /> the mine site. The magnitude of this problem may not have been fully <br /> identified, due to some abnormally (and possibly erroneously) high detection <br /> limits used in the laboratory sample analysis. The Division may at some time <br /> in the future require NCEC to perform additional monitoring related to this <br /> situation. No action is required by the operator at this time. <br /> The Division would appreciate responses to these issues as soon as possible. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> Jeffrey Deckler <br /> Reclamation Specialist <br /> JD/srs <br /> 091OF <br />