My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-07-10_REPORT - C1984065
DRMS
>
Day Forward
>
Report
>
Coal
>
C1984065
>
1986-07-10_REPORT - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 11:33:45 AM
Creation date
9/11/2015 10:01:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Report
Doc Date
7/10/1986
Doc Name
1985 AHR Letter
From
NCEC
To
DMG
Annual Report Year
1985
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. OW-9 is not included in NCEC' s permit as a required monitor- <br /> ing well. Baseline data has been gathered and monitoring is not <br /> planned for this well in the near future . Monitoring is <br /> scheduled to resume one year prior to Phase B; the current permit <br /> being Phase A. <br /> 4 . Section 2%2 of the 1985 Annual Hydrology ' Report contains in- <br /> formation regarding the apparent decrease in water quality of <br /> holes OW-8 and OW-14. The holes are downgradient from the mine <br /> site, but they are also greatly affected by field irrigation from <br /> the Vulcan Ditch. The report notes that the largest water <br /> quality change occurred in September 1985, but since mine con- <br /> struction did not begin until October 15 , 1985 , the apparent <br /> change is not associated with any mine surface activities. <br /> 5. No comment is available at this time. <br /> 6. Revised pages to Section 3 of the permit will be submitted <br /> soon. <br /> 7. Please elaborate on your concerns regarding the completion of <br /> OW-15 and OW-16 . This area is important to NCEC as a permanent <br /> rail loadout site. We will need to know that water monitoring is <br /> required for this location to establish baseline data. <br /> 8 . Comment noted. <br /> If futher information is required, please do not hesitate to con- <br /> tact me. <br /> Sincerely, <br /> E. Peter Matthies <br /> President and <br /> Chief Executive Officer <br />
The URL can be used to link to this page
Your browser does not support the video tag.