Laserfiche WebLink
4- <br />12. Primary future (Post -mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary Present land use (check one): <br />0 Cropland(CR) Pastureland(PL) <br />M Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />j <br />Wildlife Habitat(WL) <br />I Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Scraper,dozer, front-end loader, and trucks. <br />15. On Site Processing: - V _L Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Existina 110 is being expanded to comply with boundary violation The proposed expansion <br />does cover areas previously mined. We do not intend to reclaim previously mined areas by <br />ethers.