Laserfiche WebLink
TABLE 2.05.3-2 <br />ANNUAL MINING OPERATION STATISTICS <br />NEW HORIZON NORTH MINE <br />YEAR <br />ACRES <br />DISTURBED <br />COAL <br />TONS <br />OB/PARTING <br />CUBIC YARDS <br />STRIPPING <br />RATIO <br />2013-2017 <br />195.8 <br />1,323,044 <br />11,748,520 <br />8.88:1 <br />2018-2020 <br />83.5 <br />679,037 <br />3,335,173 <br />4.91:1 <br />TOTAL <br />279.3 <br />2,002,081 <br />15,083,693 <br />7.53:1 <br />TABLE 2.05.3-3 <br />TIMING OF OPERATIONS <br />(DESCRIBE MILESTONES RELATED TO NHN) <br />ITEM <br />DESCRIPTION <br />DATE <br />1 <br />Relocate 2nd Park Lateral to pipeline <br />Fall 2011 <br />2 <br />Construct Surface Facilities; Extend or Relocate Utilities <br />Fall 2012 — Spring 2013 <br />3 <br />Complete mining at NH2; Move Equipment to NHN <br />Mid -2013 <br />4 <br />Mine NHN Area <br />Mid -2013 — Mid -2020 <br />5 <br />Relocate 2nd Park Pipeline to Original Ditch Location <br />2016 <br />6 <br />Re -topsoil and re -vegetate final cut area <br />2019 <br />7 <br />Continue to irrigate & monitor reclaimed areas until final <br />bond release <br />2029 <br />Section 2.05.3 Page 5 August 2015 (MR -15) <br />