August 19, 2015 C-2010-089/New Horizon North Mine BFB <br />relatively good condition and are currently functional but will need maintenance. <br />Pond 001 contained water but was not discharging. In the June 9, 2015 inspection report, it was noted that the 2nd <br />Park Lateral Ditch low point drain may have been leaking into the Pond 001 discharge flume. At the time it was <br />unclear if WFC had to sample the discharging water because it was flowing through the discharge point but the <br />source of the water was not Pond 001. WFC has since repaired this issue (photo 4). The 2nd Park Lateral Ditch <br />Drain now has its own separated discharge point from the Pond 001 discharge. By separating the two discharges, <br />it will now be clear if WFC has to sample the water discharging from Pond 001. <br />Pond 002 contained a small amount of water but was not discharging. Vegetation was starting to sprout on the <br />embankment of Pond 002 but is not well established yet. Some rills were starting to develop (photo 5). <br />TR -10 was submitted to the Division on July 16, 2015 incorporating the as -built drawings for Pond 002. The as - <br />built Map 2.05.3(4)-10 was verified during this inspection. Gabion baskets filled with rocks were installed at the <br />top of the Pond 002 east inlet (photo 6). The primary and emergency spillway pipe diameters and locations were <br />verified. Mr. Ross Gubka of WFC used a Trimble GPS unit to verify all the following elevations and slopes. The <br />primary spillway riser, the 18' primary spillway CMP, the emergency spillway drop inlet and emergency spillway <br />CMP were all correct. The weep holes on the primary risers were .2 feet higher than the map showed but the <br />Division does not have an issue with this item. The long handles to operate the weep holes were in place. The top <br />of the embankment was the correct elevation. The slopes on the inside of the pond were also measured. At 50 feet <br />south of the emergency spillway the slope was 33.29%, C' the slope was 33.27% and at B' it was 32.34%. In <br />conclusion, the Pond 002 as -built Map 2.05.3(4)-10 matches the on -ground conditions. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />The non -Progresso topsoil was live hauled from in front of the pit (eastern side) to the area east of the <br />topsoil stock piles. <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 5 <br />