Laserfiche WebLink
Table 3 <br />Four Corners Materials - Bayfield Gravel Operation <br />Lagged Depletions and Water Replacement Requirement for Years Seven and Eight <br />Month <br />Total Depletions <br />Total Lagged Depletions <br />Gosney Pump Requirements Due <br />to Irrigation Season Depletions <br />(acre feet) (acre feet) <br />(cfs) <br />1 2 <br />3 <br />January <br />0.57 <br />0.69 <br />0.00 <br />February <br />2.39 <br />1.99 <br />0.00 <br />March <br />6.40 <br />5.44 <br />0.00 <br />April <br />11.57 <br />10.27 <br />0.00 <br />May <br />16.74 <br />15.40 <br />0.25 <br />June <br />22.09 <br />20.71 <br />0.35 <br />July <br />20.35 <br />20.52 <br />0.33 <br />August <br />15.23 <br />16.42 <br />0.27 <br />September <br />12.99 <br />13.69 <br />0.23 <br />October <br />7.66 <br />8.92 <br />0.15 <br />November <br />3.66 <br />4.75 <br />0.00 <br />December 1 <br />0.57 <br />1.41 <br />0.00 <br />Annual 1 <br />120.21 <br />120.21 <br />Column Notes <br />(1) Equals Table 2, Column 5. <br />(2) Equals Column 1, lagged using the Glover Depletion Factor decreed in Case No. 07CW104 (see Columns 4 and 5) <br />(3) Equals Column 2 / number of days per month / 1.983. Only irrigation season months are calculated. <br />(4) Equals the month since the pumping started. Month 1 = the first month of pumping <br />(5) Shows the decreed Glover Depletion Factor used to calculated the lagged depletions based on the months since pumping. <br />Decreed Glover Depletion Factor from <br />07CW104 <br />Month Since <br />Pumping Started <br />(% of Pumping <br />Returned) <br />4 <br />5 <br />Month 1 <br />78% <br />Month 2 <br />18% <br />Month 3 <br />4% <br />Month 4 <br />0% <br />Month 5 <br />0% <br />Month 6 <br />0% <br />Month 7 <br />0% <br />Month 8 <br />0% <br />Month 9 <br />0% <br />Month 10 <br />0% <br />Month 11 <br />0% <br />Month 12 <br />0% <br />Annual <br />100% <br />P:\031-007\100- Pine River\Bayfield Facility\SWSP\SWSP Renewal 2015\ <br />Bayfleld Pit SWSP 2015 Tables and Appx Wright Water Engineers, Inc. Des By: RKH <br />Table 3 Lag SWSP March 2015 Ckd By: PRF <br />