My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-25_HYDROLOGY - M1987038
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1987038
>
2015-08-25_HYDROLOGY - M1987038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:10 PM
Creation date
8/26/2015 5:06:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
HYDROLOGY
Doc Date
8/25/2015
Doc Name
Substitute Water Supply Plan
From
DWR
To
Wright Water Engineers, Inc
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br />Four Corners Materials - Bayfield Gravel Operation <br />Lagged Depletions and Water Replacement Requirement for Full Build -Out <br />Month <br />Total Depletions <br />Full Build -Out <br />Gosney Pump <br />Total Lagged Depletions Requirements Due to <br />Full Build -Out Irrigation Season <br />Depletions <br />(acre feet) <br />(acre feet) (cfs) <br />(1) <br />(2) (3) <br />Jan <br />0.00 <br />0.12 0.00 <br />Feb <br />1.85 <br />1.44 0.00 <br />Mar <br />5.83 <br />4.88 0.00 <br />Apr <br />10.83 <br />9.57 0.00 <br />May <br />15.98 <br />14.65 0.24 <br />Jun <br />21.35 <br />19.96 0.34 <br />Jul <br />19.79 <br />19.92 0.32 <br />Aug14.66 <br />15.85 0.26 <br />Sep <br />12.43 <br />13.13 0.22 <br />Oct <br />7.09 <br />8.35 0.14 <br />Nov <br />3.10 <br />4.19 0.00 <br />Dec <br />0.00 <br />0.84 0.00 <br />Annual <br />112.90 <br />112.9 <br />Column Notes <br />(1) Equals Table 2, Column 1. <br />(2) Equals Column 1, lagged using the Glover Depletion Factor decreed in Case No. 07CW104 (see Table 3, Columns 4 and 5). <br />(3) Equals Column 2 / number of days per month / 1.983. Only irrigation season months are calculated. <br />P:\031-007\100 - Pine River\Bayfield Facility\SWSP\SWSP Renewal 2015\ <br />Bayfield Pit SWSP 2015 Tables and Appx Wright Water Engineers, Inc. Des By: RKH <br />Table 4 Lag Full Buildout March 2015 Ckd By: PRF <br />
The URL can be used to link to this page
Your browser does not support the video tag.