Laserfiche WebLink
Table Footnotes: <br />Mining Use and sand and gravel extraction shall be authorized only where the following <br />conditions are met or satisfied as demonstrated during a formal administrative review by the <br />Planning Director or designee: <br />A. On -Site Sewage Disposal: All on-site sewage disposal systems shall be sited, designed, <br />and constructed in compliance with local and state health standards. <br />B. Hazardous Substances: All state and federal requirements for handling and storage of <br />hazardous substances shall be satisfied. <br />C. Access to Public Roads: Access onto County roads require a permit from the County <br />Road and Bridge Department, and onto State highways, from the State Highway <br />Department. <br />D. Signs: Signs shall comply with the performance standards of Division 8, Article V. <br />E. Noise: All mining uses shall demonstrate continuing compliance with any applicable state <br />and federal noise standards. <br />Light, Glare: Any use that regularly directs excessive light, glare, or heat beyond the <br />property line shall be prohibited. <br />G. Shielding: Welding equipment and similar sources of intense light shall be shielded from <br />neighboring properties or public way by enclosure in a building, location on the property, <br />construction of a fence or wall, or a landscaped buffer. <br />H. Interference: Any use that creates electrical interference beyond the property line shall be <br />prohibited. <br />Solid Waste Storage: Solid waste shall be stored in an enclosed building or in bear -proof <br />containers and handled in a manner that does not: (1) attract bears, rodents, flies, or <br />other animals or pests; (2) generate odors, perceptible beyond the property boundaries; <br />(3) create liquid runoff onto soil or off-site; and (4) permit the blowing of paper and other <br />trash or waste. <br />Runoff: Construction or use that channels storm or melt water runoff in a manner that <br />adversely impacts neighboring properties or public ways shall be prohibited. <br />K. Permits and Licenses. All uses shall be operated only in accordance with federal and <br />state licensing and permitting requirements. <br />2. Applications for a Conditional Use Permit for Single Family Dwelling (not related to mining or oil <br />and gas production) shall meet all of the following requirements: <br />A. All applications shall conform to the Conditional Use Permit requirements stated in <br />Division 5 of Article 5. <br />B. All applications, including the required geo-technical report, shall be forwarded to the <br />Colorado Geological Survey for a review and evaluation of the proposed use and site <br />constraints. The applicant shall pay all costs assessed or charged by the Colorado <br />Geological Survey for the review and processing of the application. Within fifteen (15) <br />days following the County's receipt of a report from the Colorado Geological Survey, the <br />applicant shall submit a written response to the Planning Director/County designee <br />addressing in detail the applicant's proposed methods for mitigating any hazards or <br />Park County Land Use Regulations <br />Article V — Page 34 Revised 03/15 <br />