Laserfiche WebLink
Scope of Work <br />5 MN Borehole to 6 MN Pond <br />Buried Dewatering Line <br />07/28/15 <br />Background <br />Twentymile Coal, LLC (TC) is looking to construct approximately 4,720' of buried 10" HDPE <br />pipeline around the 6MN pond. This project will include approximately 4,220' of pipeline running <br />from the 5 MN borehole to the existing 6 MN pond, an existing stock pond as well as the 6MN pump <br />house. This project also includes approximately 500'of pipeline that will connect the 6MN pump <br />house to the 10 Right pipeline. The project will also require the installation of 5 - 10' diameter by 10' <br />high culverts, four gate valves, one check valve and pressure gauge. One culvert will be located at the <br />5 MN borehole and will provide access to the top of the borehole as well as the check valve and <br />pressure gauge. The remaining culverts will be located at the gate valves. <br />Bidders are requested to prepare a turn -key, lump sum proposal for the work generally described in <br />this scope of work below. The proposal shall include: <br />1. A detailed description of all work the contractor is intending to perform. <br />2. A schedule detailing contractor's plan to complete the project within TC's project timing. <br />3. An itemized bid including all major categories of the proposal. <br />Drawings of the general site plan have been included with this scope of work. See Figure 1. <br />Primary Site Contact: <br />Jon Bobbera <br />970-870-2789 Work <br />304-784-2078 Cell <br />jbobbera@peabodyenergy.com <br />Location <br />Secondary Contact: <br />Michael Berdine <br />970-870-2782 Work <br />970-846-9686 Cell <br />mberdine@peabodyenergy.com <br />The TC mine site is located approximately 9 miles north of Oak Creek, Colorado, on Routt County <br />Road 27. The approximate 4,720' long pipeline is located at TC's 6MN pond which is 2 miles north of <br />Routt County Road #33 along a mine maintained access road. <br />Project Timing <br />The projected dates and timing for the project are as follows: <br />1. Submit responsibilities, specifications and scope of work to contractors 04/21/2015 <br />2. Bids due to TC 05/22/2015 <br />Page 2 <br />