My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-18_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2015-08-18_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:00 PM
Creation date
8/19/2015 1:06:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
8/18/2015
Section_Exhibit Name
2.04 Environmental Resources
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wadge Overburden, Wadge Seam, Wadge/Wolf Creek Interburden, and Wolf Creek Seam <br />The Wadge Overburden consists of a sequence of siltstones, shales, coal, and fine- grained sandstones. The sequence <br />varies in thickness from 50 to 100 feet, averaging approximately 75 feet. The Wadge Coal Seam varies in thickness <br />from 8.5 to 11.5 feet, and forms a gradational contact with the underlying carbonaceous mudstone. The Wadge Seam <br />is relatively consistent and uniform, and is laterally continuous throughout the Twentymile Park Basin. The <br />Wadge/Wolf Creek Interburden is composed of a series of thick shales, claystones, siltstones, and intermittent <br />lenticular sandstones, and is similar to the Wadge Overburden, although typically finer - grained and reflecting greater <br />consolidation. The Wolf Creek Seam is limited in lateral continuity and continuous only within discrete mining <br />areas. Within these areas, the Wolf Creek Seam splits into up to four distinct benches separated by rock partings. <br />The combined total seam thickness ranges from 7.5 to 14 feet. As documented by previous studies (Robson and <br />Stewart 1990), this geologic sequence, which forms the lower portion of the Williams Fork Formation, generally <br />functions as a single hydrologic unit. <br />Both the Wadge Overburden and Wadge /Wolf Creek Interburden have been characterized relative to ground water <br />conditions, and have similar characteristics, although the lower portions of the unit (Wadge /Wolf Creek Interburden <br />and Wolf Creek Seam) are characterized by finer -grain structure and greater consolidation, so ground water <br />occurrence and movement within the lower strata may be more limited. Both the Wadge Overburden and <br />Wadge/Wolf Creek Interburden are characterized by low permeability, limited continuity, low yield and relatively <br />poor water quality. These factors preclude utilization of the ground water contained in this sequence for all practical <br />purposes, except small stock watering installations. The Wadge Overburden and Wadge/Wolf Creek Interburden have <br />been or will be directly affected by ongoing and future mining operations. <br />Field data from ground water monitoring wells shown on the Twentymile Park Hydrology Map (Map 13) were used <br />to construct a potentiometric contour map for the Wadge Overburden sequence in this area for August- September <br />1983, prior to the start of underground mining. The potentiometric map for the Wadge Overburden was constructed <br />using only water level date which were deemed to be reliable. Previous potentiometric maps had used water level <br />data from wells that were not fully completed in the Wadge Overburden sequence. The following criteria were <br />used to select data for construction of the map. <br />1. Water level data must be from wells that have reliable completion information to confirm that the well <br />is completed in the Wadge Overburden. <br />2. Overburden wells in the center of the Twentymile Park Basin, where flowing artesian head conditions <br />exist, must be adequately "shut -in" to obtain a reliable pressure reading. <br />3. Water level data must be taken with the period of August to September, 1982. <br />Water level elevation data from Wadge Overburden wells which met all the above criteria area shown in <br />parentheses below the well on Map 13, Twentymile Park Hydrology. The Wadge Overburden wells that could not <br />be used for construction of the potentiometric map are listed with the criteria that were not met: <br />Well Criteria Not Met Comments <br />001-SW-7 3 <br />001 -L -1 3 <br />001 -D -5 <br />006 -W -1 <br />006 -W -17 <br />006 -W -18 <br />006 -80 -2 <br />006-82-38 <br />06 -81 -31 2 <br />06 -82 -62 3 <br />21 -81 -16 2 <br />1 <br />No completion data <br />1 <br />No completion data <br />1,2 <br />No completion data <br />1,3 <br />No completion data <br />1 <br />Suspect completion data <br />TR13 -83 2.04 -21 11/03/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.