My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-09_PERMIT FILE - C1981014
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2015-07-09_PERMIT FILE - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:03 PM
Creation date
8/19/2015 9:43:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
7/9/2015
Section_Exhibit Name
4.20 Subsidence Control
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Doc <br />:12112001 III IIIIIIIIIIIIIIII <br />S I1_ 4.20 SUBSIDENCE CONTROL <br />4.20.1 GENERAL REQUIREMENTS <br />All underground mining activities are planned and conducted to minimize <br />subsidence and prevent or limit material damage to surface structures and <br />areas. Subsidence control measures are designed, to the extent <br />technologically and economically feasible, to maintain the value and <br />reasonable foreseeable use of surface lands. <br />The Southfield mining operations will comply with all applicable <br />provisions of subsidence control and monitoring plans. Details of these <br />plans are presented in Section 2.05.6(6), Subsidence Survey, Subsidence <br />Monitoring, and Subsidence Control Plan. <br />4.20.2 PUBLIC NOTICE <br />• All owners of property and residences within the area above underground <br />workings will be notified by mail at least six (6) months prior to mining <br />beneath the subject property or residence. The notification will contain <br />the following: <br />o Identification of specific areas in which mining will be <br />conducted <br />o Dates of mining activities that could cause subsidence and <br />affect specific structures <br />o Measures to be taken to prevent or control adverse surface <br />effects. <br />4.20.3 SURFACE OWNER PROTECTION <br />Southfield Mine will comply with all provisions of the subsidence control <br />plan presented in Section 2.05.6(6). If, in the unlikely event that <br />. subsidence causes material damage or reduces the value or reasonable <br />foreseeable use of surface lands, EFCI will restore, rehabilitate, or <br />remove and replace damaged structures, to provide compensation for lost <br />value or reduction in potential use, or restore affected lands to a <br />4.20-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.