My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-12_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-08-12_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:54 PM
Creation date
8/13/2015 8:32:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/12/2015
Doc Name
CQA Report - Weeks ending July 25 and August 1, 2015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. j <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />Cat dozers placed SLF between stations E1+00 to E12+00. A Cat smooth drum roller compacted <br />the SLF surface between stations E0+00 to E7+00. A water truck with fire hose attachment was <br />used to moisture condition the finished slopes. <br />Cat dozers placed SLF upslope of ADR Haul Road stations 14+00 to 15+00. Cat smooth drum <br />rollers compacted the SLF surface. <br />Cat smooth drum rollers compacted the SLF surface between stations D8+00 to D10+00. <br />Cat dozers placed SLF between stations E1+00 to E10+00, between stations FF10+00 to <br />FF6+00 and downslope from stations G0+00 to G4+00. <br />Ames resumed processing SLF material at the Cameron stockpile. <br />All of the above Soil Liner Fill material was placed, compacted, and graded per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />None. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.