My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-12_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-08-12_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:54 PM
Creation date
8/13/2015 8:32:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/12/2015
Doc Name
CQA Report - Weeks ending July 25 and August 1, 2015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. 1 <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: August 1, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 7.26.2015 through 8.1.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 63°F to 79°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 44°F to 50°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A GPS equipped Cat D7 dozer and a GPS equipped Cat D6 dozer graded upslope from stations <br />D5+00 to D7+00. <br />A John Deere excavator loaded Cat 740 haul trucks with Structural Fill in the vicinity of station <br />D10+00. A Cat dozer placed the material between stations F24+00 to F28+00. A Cat smooth <br />drum roller compacted the fill area. <br />A Cat dozer finish graded slopes and a Cat smooth drum roller compacted slopes between <br />stations D10+00 to DM1+00 and FM4+00 to FM8+00. <br />A Cat dozer knocked down the stockpiled Structural Fill between stations N20+00 and N22+00. <br />A Cat excavator loaded stockpiled material into Cat 740 haul trucks from the slope above the <br />ADR Haul Road station 19+00. The material was stockpiled below the Area 34 topsoil stockpile <br />for future use as Structural Fill. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Days <br />S <br />I M I <br />T I W <br />I T <br />F <br />S <br />Work Shifts <br />D <br />D D <br />D <br />D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 63°F to 79°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 44°F to 50°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A GPS equipped Cat D7 dozer and a GPS equipped Cat D6 dozer graded upslope from stations <br />D5+00 to D7+00. <br />A John Deere excavator loaded Cat 740 haul trucks with Structural Fill in the vicinity of station <br />D10+00. A Cat dozer placed the material between stations F24+00 to F28+00. A Cat smooth <br />drum roller compacted the fill area. <br />A Cat dozer finish graded slopes and a Cat smooth drum roller compacted slopes between <br />stations D10+00 to DM1+00 and FM4+00 to FM8+00. <br />A Cat dozer knocked down the stockpiled Structural Fill between stations N20+00 and N22+00. <br />A Cat excavator loaded stockpiled material into Cat 740 haul trucks from the slope above the <br />ADR Haul Road station 19+00. The material was stockpiled below the Area 34 topsoil stockpile <br />for future use as Structural Fill. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.